Bathroom Remodel Gallery

Back to Whittlink Index
Back to Picture Gallery 2002
Before
Back to Remodeling Gallery
In process I ...
June 2002 - Larry and I demolish this bathroom. It takes a month. We also remove the closet to the bedroom that back this shower, and the linen closet on the other side of it.
In process II ...
In the meantime, we special-order all the plumbing fixtures (Kohler, the style is called Revival, and the finish is satin or brushed nickel), the bathtub, the linen closets, the vessel sink, and the table the vessel sink will sit on.
In process III
Larry has installed all of the electrical outlets, and the lighting fixtures and switches gang boxes. The wall are framed out, and we dryfit the tub and the shower pan.
In process IV
Larry has installed the pocket door, and almost all the plumbing is roughed in.
In process V
The insulation is in, the sheet rock is on (mostly). Now begins the midding and taping and sanding. The ceiling will be done first, and then the floor will be tiled, but only after the sheet rock is fully prepped.
In process VI
Time for tile. First: the floor.
In process VII
Now, tiling around the tub.
In process VIII
Continuing on the walls ...
In process IX
More on the walls ...
In process X
Toilet and sink is in!
In process XI
Paint .... lights .... grab bars ... the color is terracotta, but Larry swears it's orange ...
In process XII
Finishing touches ... but it isn't done yet. Getting closer to finished.
  Last Update: January 2003